Switching on the product

The tasks described in this section may only be carried out by a qualified electrician.

Requirement(s):

Product is installed correctly.

All connectors are fully inserted into the ECU.

Product is not damaged.

The necessary protective devices are installed in the upstream electrical installation in compliance with the relevant national regulations.

Protective devices

During the initial setting-up process, the product was inspected in accordance with IEC 60364-6 and the applicable national regulations (e.g. in Germany: DIN VDE 0100-600).

Testing the product

  1. Switch on the power supply and check.

Check the power supply